Don
THE FIRST HALF-MILLION VOLT D.C. TRANSMISSION LINE (1965) (AAPG W3606/1161)
Video link...
https://www.youtube.com/watch?v=a9zdz780l-U
Hi my name is Don Bishop and this is my “Deal” Today... Basically, anything that interest me. Music, Computers, Software, Apps, Linux OS's - Distros, Space, Science, Auto's, Trucks, 4x4's, Motorcycles and other slightly interesting info that I find on the Web. There may, or may not be, any correlation between my Posts. Just whatever interests me at the time. I hope someone out there finds some of this interesting too!:)
Video link...
https://www.youtube.com/watch?v=a9zdz780l-U
How electricity is fed to the Cook Strait submarine cable. Surveying for the line; building the bridges, roads, and camps needed; erecting a tower above Benmore dam; taking tow-ropes across country by hand and by tractor; and stringing and jointing conductors. 2K scan from 16mm print.
No comments:
Post a Comment